Stadswinkel 2 Tilburg - st2ti1010a.jpg

Fotograaf
Hans Morren
    Description

    T-connection to an existing closed wall at Stadskantoor Tilburg, the Netherlands.

    Here we see how a QbiQ iQ Structural 100 partitions met existing closed wall. At the point of the existing wall a AP111 and AP111C is used to cover de end of the wall. The glass wall on the corridor side continues neatly. A small glass panel is placed at right angles on the partition to reduce sound transmission.

    All aluminum parts are coated in the color RAL9003, Signal white.

     

    Project datum
    Productgroep
    Profiel type
    Profiel kleur
    Wand dikte
    Wand panelen
    Lagen glas
    Exif Titel
    Stadswinkel - Tilburg / Deur KDD90F /Qbiq BV / Oktober 2023
    Datum foto genomen
    Bestand datum
    ISO
    100
    Exposuretime
    3.2s
    Maximale hoogte
    2602
    Maximale breedte
    3780